Kes Geyser Load Control Timer Manual New | INSTANT × 2024 |
The timer bypasses schedules and forces the geyser to run continuously.
Press the Override button to switch the geyser ON immediately.
Ensure the main circuit breaker feeding the timer is turned ON. Let the unit charge for 15 to 30 minutes, then press the Reset pinhole button to clear the memory and reboot the CPU. 2. The Geyser Turns On at the Wrong Times
A: Check the supply voltage at terminals L IN and N. If voltage present, likely an internal power supply failure – replace the timer. kes geyser load control timer manual new
Press the button a second time. The screen will transition to show 1 OFF .
While still holding the Clock button, press to adjust the current minutes. Release the Clock button. Your current time is now saved. Programming the ON/OFF Schedules
This profile keeps the geyser powered off at all times. It is essentially a master "off" switch, which can be useful for extended periods when the property is unoccupied. The timer bypasses schedules and forces the geyser
Turn off the main power switch inside the master DB box. Mount the Unit:
The timer cannot run its schedule accurately if its internal clock is wrong. To set the master clock:
Enters the programming schedule mode and cycles through the 16 settings. D+ (Day): Sets the days of the week. H+ (Hour): Sets the current or scheduled hour. M+ (Minute): Sets the current or scheduled minute. Let the unit charge for 15 to 30
For safety, all electrical installations should be performed by a qualified electrician.
should be installed by a licensed professional. It can be mounted directly onto a in your distribution board (DB) or surface-mounted in a ceiling cavity near the geyser.