Before beginning the physical installation, verify that the controller kit contains all original parts. If any components are compromised or missing, contact your authorized Daikin Comfort dealer immediately. Box Inventory
button for 5 seconds to view specific error codes if the system stops. Display Blank Check the wiring at terminals and ensure the main breaker is on. Self-Diagnosis by Remote Controller (SkyAir, VRV ) - Daikin
Before beginning the installation, ensure you have all the necessary components and tools. Package Contents Remote controller unit (Main body and upper case) Wood screws (2 pieces for direct wall mounting) Machine screws (2 pieces for switch box mounting) Installation manual Technical Specifications Non-polar, 2-core cable. Wiring Size: 0.75 mm² to 1.25 mm². Maximum Wiring Length: Up to 500 metres total run.
Check the power supply to the indoor unit and confirm the wire connections are secure.
The Daikin BRC1C51/61 can be flush-mounted into a standard electrical switch box or mounted directly to a flat wall surface. Step-by-Step Mounting
Press the bottom of the upper case downward until you hear the lower clips snap securely into place.
: These wires are non-polar , meaning it does not matter which wire goes to which P1/P2 terminal. Cable Specs : Use 2-core sheathed vinyl cord or cable ( ) with a maximum length of 500 meters.
Before beginning the installation, it's helpful to be aware of the system's advanced capabilities. The BRC1C61 has a full suite of modern features:
Avoid areas with direct sunlight, drafts from windows, or direct discharge air from the indoor unit.
(Main LCD unit with internal thermistor)